31.1 C
London
Sunday, August 9, 2020

SNOWTAM (Basic information about weather)

- Advertisement -
- Advertisement -

SNOWTAM is a special series NOTAM notifying the presence, or removal, of hazardous conditions due to snow, ice, slush, or standing water associated with snow, slush, and ice on the movement area, by means of a specific format.

#Refer [Annex 15 Chapter 2]

**A SNOWTAM will be issued by the airport authority, when warranted, to notify users of the presence of, or the removal of, hazardous conditions due to snow, ice, slush, or the resulting standing water on the moving surfaces of the aerodrome. The maximum validity period for a SNOWTAM is 24 hours and a new SNOWTAM will be issued whenever there is a significant change in conditions.

The following runway condition related changes are considered significant:

1) A change in the coefficient of friction of approximately 0.05

2) Changes in depth of deposit greater than the following: 20 mm for dry snow, 10 mm for wet snow, 3 mm for slush.

3) A change in the available length or width of a runway of 10 percent or more.

4) Any change in the type of deposit or extent of coverage which requires reclassification in Items F or T of the SNOWTAM.

5) When critical snow banks exist on one or both sides of the runway, any change in the height or distance from the centerline.

6) Any change in the conspicuity of runway lighting caused by obscuring the lights.

7) Any other conditions are known to be significant according to experience or local circumstances.

[grwebform url=”https://app.getresponse.com/view_webform_v2.js?u=GjKtW&webforms_id=37078602″ css=”on” center=”off” center_margin=”200″/]

Format and Decode

A typical SNOWTAM will consist of a header block, which contains the addressees, the date and time of issue and the SNOWTAM serial number, and the body of the SNOWTAM which contains all of the pertinent airfield information. The airfield information is consistently formatted as items A) through T) as follows:

*AERODROME IDENTIFIER

*DATE/TIME OF OBSERVATION (UTC)

*RUNWAY DESIGNATOR

*CLEARED RUNWAY LENGTH (if less than published length)

*CLEARED RUNWAY WIDTH (if less than published width)

*DEPOSITS OVER TOTAL RUNWAY LENGTH (Observed on each *third of the runway)

*MEAN DEPTH OF DEPOSITS (mm) (for each third of total runway length)

*FRICTION MEASUREMENTS OR ESTIMATES (for each third of runway length)not used

*CRITICAL SNOWBANKS (if present)

*RUNWAY LIGHTS (if obscured)

*FURTHER CLEARING OPERATIONS (if planned)

*FURTHER CLEARANCE EXPECTED TO BE COMPLETED BY . . . *(UTC)

*TAXIWAYnot used

*TAXIWAY SNOWBANKS not used

*APRON

*NEXT PLANNED OBSERVATION/MEASUREMENT

*PLAIN LANGUAGE REMARKS

*Any items not pertinent to existing conditions will not be included in the report. For aerodromes with more than one runway, items C) through P) will be repeated in ascending order of runway identifier. To contaminate codes, friction measurement device codes, and complete format and decode information.

ICAO Annex 15, Appendix 2 (Reference).(Download Pdf)

[grwebform url=”https://app.getresponse.com/view_webform_v2.js?u=GjKtW&webforms_id=37078402″ css=”on” center=”off” center_margin=”200″/]

- Advertisement -

Latest news

Recap (What is Overdue Aircraft?)

Consider an aircraft to be overdue, initiate the procedures stated in this section and issue an ALNOT when neither communications nor radar contact can...
- Advertisement -

SNOWTAM (Basic information about weather)

SNOWTAM is a special series NOTAM notifying the presence, or removal, of hazardous conditions due to snow, ice, slush, or standing water associated with...

Up-coming FlyMags Online Aviation Essay Competition First- Best Writer Wins $200.

Up-coming FlyMags Online Aviation Essay Competition First- Best Writer Wins $200.RegisterWelcome to FlyMags 1st Online Aviation Essay Competition About FlyMags FlyMags since its establishment in 2018,...

Parallel Runway Approaches and Departures – Basic Understanding

Dependent approaches:(Simultaneous parallel approaches) Allow aircraft to approach parallel runways, but controllers must ensure a minimum separation from aircraft on the adjacent approach path (diagonal...

Related news

Recap (What is Overdue Aircraft?)

Consider an aircraft to be overdue, initiate the procedures stated in this section and issue an ALNOT when neither communications nor radar contact can...

SNOWTAM (Basic information about weather)

SNOWTAM is a special series NOTAM notifying the presence, or removal, of hazardous conditions due to snow, ice, slush, or standing water associated with...

Up-coming FlyMags Online Aviation Essay Competition First- Best Writer Wins $200.

Up-coming FlyMags Online Aviation Essay Competition First- Best Writer Wins $200.RegisterWelcome to FlyMags 1st Online Aviation Essay Competition About FlyMags FlyMags since its establishment in 2018,...

Parallel Runway Approaches and Departures – Basic Understanding

Dependent approaches:(Simultaneous parallel approaches) Allow aircraft to approach parallel runways, but controllers must ensure a minimum separation from aircraft on the adjacent approach path (diagonal...
- Advertisement -

LEAVE A REPLY

Please enter your comment!
Please enter your name here